Installer Partner Resource
Design & Size Solar Systems for the BVI and Caribbean
A step-by-step workflow guide for certified Suncore installer partners — from site assessment through final system specification.
How It Works
The Suncore Design Workflow
Suncore's solar sizing tool is purpose-built for the BVI and Caribbean grid environment. This guide walks you through each phase of the design process so you can deliver accurate, bankable proposals to your clients — whether they're homeowners, commercial operators, or government infrastructure projects.
Step-by-Step
Using the Suncore Sizing Tool
Site Assessment & Load Analysis
Begin every project with a thorough on-site assessment. Measure roof area, orientation, and shading. Pull 12 months of utility bills to establish a reliable average monthly kWh baseline. For BVI and USVI clients, note the BEC or WAPA rate tier — typically $0.35–$0.45/kWh — as this directly drives the financial model.
- Photograph all roof planes and note obstructions
- Record the utility account number for incentive applications
- Confirm available roof area vs. required array footprint
Enter Project Parameters in the Sizing Tool
Open the Suncore Solar Sizing Tool and select the correct territory from the Caribbean territory list. Input the client's monthly bill, home or facility size, energy goals, and grid-independence target. The tool automatically applies BVI-specific peak sun hours (5.2–5.8 hrs/day) and local electricity rates.
- Select 'Business' for commercial or government projects
- Use the 'Maximum Independence' setting for hurricane-resilience builds
- The tool supports 20+ VI and Caribbean territories
Review the System Recommendation
The tool outputs an inverter model (12K, 15K, 18K for residential; 30K, 60K, 100K for commercial), battery count, estimated solar array size, and a full financial breakdown including payback period and lifetime savings. Review the CO₂ offset and incentives panel with your client.
- Cross-check inverter sizing against actual load profile
- Confirm battery count supports the client's backup duration target
- Print or save the results PDF for the proposal package
Finalize the Proposal & Submit
Use the sizing tool output as the basis for your formal proposal. Attach Suncore product datasheets, your installation timeline, and any applicable BVI Electricity Corporation grid-connection documentation. Submit the lead capture form to notify the Suncore team and receive partner pricing.
- Include BEC grid-connection application reference number
- Attach the Suncore inverter and battery spec sheets
- Contact your Suncore partner rep for volume pricing
Field-Tested Guidance
BVI & Caribbean System Design Best Practices
The Caribbean grid environment presents unique challenges. These guidelines help you design systems that perform reliably year-round.
Design for Hurricane Resilience
All BVI and USVI installations should be engineered to IBC 2021 wind uplift standards (minimum 180 mph design wind speed). Use ballasted or penetrating racking rated for Category 5 conditions. Specify battery enclosures with IP65 or higher ratings for outdoor installations.
Account for Salt Air Corrosion
Coastal and island environments accelerate corrosion on mounting hardware, conduit, and connectors. Specify marine-grade stainless steel fasteners, UV-stabilized conduit, and connectors with IP67 ratings. Suncore inverters carry a corrosion-resistant enclosure rating suitable for coastal deployment.
Optimize for Peak Sun Hours
The BVI averages 5.4 peak sun hours per day — higher than most US markets. This means smaller arrays can achieve the same output. However, account for seasonal variation (5.0 hrs in winter, 5.8 hrs in summer) and cloud cover during hurricane season (June–November) when sizing battery backup capacity.
Grid-Tie vs. Off-Grid Considerations
BVI Electricity Corporation allows grid-tied solar with net metering for residential customers. Commercial and government projects may require a separate interconnection agreement. For remote sites or outer islands without BEC service, design fully off-grid systems with sufficient battery autonomy for 3–5 days of backup.
Permitting & BEC Interconnection
All grid-tied installations in the BVI require a BEC interconnection application and approval before energization. Allow 4–8 weeks for BEC review. In the USVI, coordinate with WAPA under their Distributed Generation program. Suncore's partner team can provide documentation templates for both jurisdictions.
Load Prioritization for Critical Facilities
For government buildings, clinics, and emergency services, design load-shedding profiles that keep critical circuits energized during grid outages. Suncore inverters support programmable load priority outputs. Work with the facility manager to identify Tier 1 (critical), Tier 2 (essential), and Tier 3 (deferrable) loads.
Get Started
Ready to Design Your Next System?
Open the Suncore Solar Sizing Tool to generate a full system specification, financial model, and proposal-ready output in minutes. Not yet a partner? Apply to join the Suncore installer network.